Middle Blue River Bank Repairs

LOCATION: Kansas City, Missouri
OWNER: City of Kansas City, Missouri Water Services Department
CONTRACTOR: ESI Construction
CONTACT: Alan Wolfe, ESI Construction, (816-523-5081)

SCOPE: This project consists of repairing eroded riverbanks and degraded river bed near the downstream end of the Blue River paved reach. The project method is to remove the unstable material and add bedding material, rockfill, 36” riprap and grouting. Earthwork includes necessary clearing; grubbing and preparation of the site; removal and disposal of all debris; excavation and trenching as required; the handling, storage, transportation and disposal of all excavated material; cutting and patching; sheeting, shoring, and protection work; preparation of subgrades; and pumping and dewatering as necessary, as well as miscellaneous concrete work on the river bank. Performing as a subcontractor to ESI, LMG supplied, hauled, and placed rip rap.

CLIENT TESTIMONIAL

“LMG Construction is a dependable WBE Certified subcontractor that we can consistently rely on to deliver a quality product while maximizing performance and safety.”

-Alan Wolfe, President, ESI Construction

Scroll to top